In association with Rithwik Projects Private Limited for the rehabilitation and upgradation of the 170-km-long Aurangabad to Jalgaon Road of NH-753F, we became the trusted partner for shifting of power and water supply lines along the corridor including the relocation of high-tension and low-tension lines for better water supply and distribution network.
The restoration was carried out in Package-I, Package-II and Package-III of the Aurangabad to Jalgaon Road. Additionally, shifting of power and water supply lines along the corridor for widening of Package–IV, which is a 45-km stretch of State Highway NH-752K from Jintur to Parbhani, was also effectively executed by us.
The work has made for effective connectivity across adjoining settlements and industrial units and has been a source of employment for skilled and semi-skilled workforce in the surrounding communities.