We collaborated with Dilip Buildcon Infrastructure Limited & Beyond to work on the 200-km long four laning project of Sangli to Solapur Road in package-I, package-II and package-IV sections of NH-166 in Maharashtra for shifting of electrical and water supply network along the highway.
Package I and II covered the distance between Sangli – Borgaon – Watambare and Package IV between Mangalwedha and Solapur. Our expertise helped in carrying out the project which involved water and power lines shifting to the borders of the highway corridor.
This project is a landmark for us in terms of scale and the quality of execution we brought in. Our on-ground team’s successful analysis of what can ease engineering and construction interventions while addressing the purpose of uniform dissemination of resources enabled seamless execution.